MRP Order Code
| MRP Order Code Description
|
A
| Planned discrete or lot for lot. Can be overridden by max, min or multiple quantity.
|
B
| Order point planning. Handled by the order proposal report. Order point qty needed.
|
C
| Order up to planning. Handled by the order proposal report. Order point needed.
|
D
| Fixed order qty planning. Lot size, max, min or multiple quantity is needed.
|
E
| Least unit cost planning. Order qty calculated using setup cost and carrying rate.
|
F
| Part period balancing planning. Order qty calculated using setup cost and carrying rate.
|
G
| Period order qty planning. Accumulates the gross requirements for the number of days given.
|
K
| Blow through planning. No additional fields are required.
|
M
| Manually planned. Demands for component parts are not generated.
|
N
| Next Level Demand.
|
O
| Master schedule level 0 part.
|
P
| Phantom part planning. No additional parts are required.
|
T
| Master schedule level 0 phantom part.
|