马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。如果您注册时有任何问题请联系客服QQ: 83569622 。
您需要 登录 才可以下载或查看,没有帐号?注册
x
Information feedback mechanism gap ( hierarchical, chain feedback and parallel, network feedback ) business plan can be well implemented, the need for effective supervision and control mechanism as the guarantee. To conduct effective supervision and control to establish a feedback mechanism. The traditional enterprise production planning information feedback mechanism is a chain of feedback mechanisms, that is to say, the information feedback is enterprise interior from one department to the next line of the transfer, due to the hierarchical organizational structure characteristics of information transfer is generally from the bottom to the Gao Cengxin information processing center ( the center of power feedback, ) formation and structure of parallel information hierarchical transmission mode. Under the environment of supply chain management enterprise information transmission mode and traditional enterprise information delivery mode. Team work for characteristics of the multi agent organization mode in the supply chain has the characteristics of network structure, therefore the supply chain management mode is not a hierarchical management, nor the matrix management, but in network management. Production scheduling information transfer is not along the internal hierarchical structure ( power ), but different node direction along the supply chain ( Network ) transfer. In order to do parallel operation of supply chain, supply chain enterprises the interaction of the information between frequency than traditional enterprise information frequency is much larger, so should be used in parallel message passing model. |