壹佰网|ERP100 - 企业信息化知识门户

 找回密码
 注册

QQ登录

只需一步,快速开始

查看: 622|回复: 2

[FI] SOS:Error message no. K/834

[复制链接]
发表于 2012/7/3 18:29:45 | 显示全部楼层 |阅读模式

马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。如果您注册时有任何问题请联系客服QQ: 83569622  。

您需要 登录 才可以下载或查看,没有帐号?注册

x

No standard cost estimate could be found for material "CK-710"
Message no. K/ 834

Diagnosis
In Profitability Analysis, an attempt was made while valuating with material costing to read for material "CK-710" a standard cost estimate released on posting date "2004.07.28".

The system has discovered that there are no error-free standard cost estimates released in plant "1000" on the specific date "2004.07.28" for material "CK-710".
The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "I10" under Define Access to Material Costing.

Display Cost Estimate for Material

Display Material Cost Estimate without Quantity Structure

System Response
It is not possible to process the document further.

Procedure
Check your system settings.
Billing release to FI时报错/
谢谢各位了,可能的问题是什么?




该贴已经同步到 xiaoerp的微博
 楼主| 发表于 2012/7/3 18:30:29 | 显示全部楼层
提示说是pa transfer时候的问题
检查一下pa transfer structure
看一下有没有标准成本估算存在  
检查一下这个 Material 在 6/28 时是否有标准成本存在  


 楼主| 发表于 2012/7/3 18:30:42 | 显示全部楼层
我想可能的错误原因是在billing时,系统同时要在costing basde COPA中记账成本和 收入,记成本应该去CO中找标准成本评估,而物料“ck-710"没有做标准成本评估。所以出错。
可以试着用ck11n 去创建标准成本评估。

1.请去创建成本评估;2.修改billing date 到创建评估生效的时间点之后,然后vfx3就过去了。

您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|手机版|壹佰网 ERP100 ( 京ICP备19053597号-2 )

Copyright © 2005-2012 北京海之大网络技术有限责任公司 服务器托管由互联互通
手机:13911575376
网站技术点击发送消息给对方83569622   广告&合作 点击发送消息给对方27675401   点击发送消息给对方634043306   咨询及人才点击发送消息给对方138011526

GMT+8, 2025/11/29 06:04 , Processed in 0.019801 second(s), 18 queries , File On.

Powered by Discuz! X3.4

Copyright © 2001-2020, Tencent Cloud.

快速回复 返回顶部 返回列表