|
|
马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。如果您注册时有任何问题请联系客服QQ: 83569622 。
您需要 登录 才可以下载或查看,没有帐号?注册
x
OVERHEAD KEY 是不是会影响损耗和间接费用两个费用?
标准成本中的损耗和间接费的公式是怎样定义的?
Controlling->Product Cost Control->Product Cost Planning->Material Cost Estimate Basic Setting->Overhead->Overhead Key
In this IMG activity, you maintain overhead keys. You can use overhead keys for individual order calculation or material-related calculation of an overhead percentage rate.
Orders, WBS elements, networks, cost-object identity numbers, base objects:
To determine an overhead percentage rate through the overhead key, you must
- assign a costing sheet to your order, WBS element, network, base object or your cost object-identity number (see IMG activity "Maintain Costing Sheet")
- enter in the assigned costing sheet, overheads that use the overhead key field.
Product costing, production orders, process orders, product cost collectors:
To determine an overhead percentage rate using the overhead key, you need to
- assign a costing sheet to your order or valuation variant for costing. (See workstep "Maintain Costing Sheets")
- enter in the assigned costing sheet, overheads that use the overhead key field.
- assign the overhead key to an overhead group. (See IMG activity "Define Overhead groups")
- enter the overhead group in the material master record for the material to be produced.
Example
If you want to assign specified orders with a special overhead, proceed as follows:
1. Enter a value in the "Overhead key" field in in the order master.
2. Assign a costing sheet that contains overheads with the "Overhead key" field to the relevant orders.
|
|