ERP知识--MPS/MRP Process Flow and its cautions
ERP知识,会的兄弟就留个见解1.Purchase Policy Code and its meaning2.Procurement Authorization Check Flow3.MPS/MRP Process Flow and its cautions4.Discount Calculation Method5.Consolidation Process Flow of Multi-Currency Book

最佳答案

查看完整内容

MRP ProcessingYou run the MRP engine through the Process MRP program.After the demand requirements are defined, the MRP engine generates the job, transfer order, and purchase suggestions to satisfy the requirements. The MRP engine uses several calculations to generate job, transfer order, and purchase suggestions. These calculations take into account all the demand requirements currently placed wi ...
发表于 2010/6/22 19:44:55 | 显示全部楼层
MRP Processing
You run the MRP engine through the Process MRP program.
After the demand requirements are defined, the MRP engine generates the job, transfer order, and purchase suggestions to satisfy the requirements. The MRP engine uses several calculations to generate job, transfer order, and purchase suggestions. These calculations take into account all the demand requirements currently placed within your database. The demands included in the calculations are defined by a beginning date (Scheduled Start Date) and a final date (Cut Off Date). Any demand requirements that occur on or between these two dates are evaluated by the MRP engine.
The MRP engine always uses the base inventory unit of measure assigned to the part in the Primary UOMs - Inventory field when performing these calculations. If the Track Multiple UOMs check box has been selected for a part, it first converts quantities and units of measure entered into transactional programs to the base unit of measure for the part before performing MRP calculations and generating suggested jobs, transfers or purchase orders. All quantity values it uses that are defined in the part master file (for example, Min On Hand, Max On Hand, Min Lot Size are specified in the base unit of measure.
Before you run the MRP calculations, make sure that the application reflects the production workflow within your manufacturing center. Each part needs an accurate method of manufacturing and a complete set of plant details; demand is generated against all levels within a method. You should also verify that the stock quantities currently recorded within inventory are correct. Your plants must also be linked to production calendars that accurately define the days and hours per day during which work will be performed.
When all of the required information is entered, you are ready to run the MRP engine. The engine handles demand requirements that originate from these sources:
•Forecasts
•Master Production Schedules
•Sales Orders
•Transfer Order Suggestions
•Inventory Restock Quantities
•Material Requirements on Jobs
•Recurring Purchase Order Quantities
The MRP engine calculates the total demand required during the defined date range for each manufactured and purchased part handled by your company. It then performs a series of calculations to determine how much supply is available to satisfy the demand. The MRP supply logic asks these questions:
•What quantities of a part are coming in from different locations? The MRP engine calculates supply quantities from the following sources:
&#8226urchase Orders
•Other Jobs
•Transfer Orders
•Receipts from Inspection
•If this is a stock part, what quantities can be used from inventory? The MRP engine calculates these supply quantities using the following considerations:
•The Total On-Hand Quantity available in all warehouses that stock the part.
•The Minimum On-Hand Quantity required to be kept within stock.
•The Safety Stock Quantity required to be kept in stock for emergency situations.
•What quantities are being manufactured? The MRP engine calculates these supply quantities from the jobs that are currently manufacturing part quantities.
•What quantities are needed each day? When the available supply quantities do not equal the required demand quantities on a specific date, the MRP engine creates job, transfer order, and purchase suggestions. The MRP engine calculates the quantities required on these suggestions using the following methods:
•If this is a non-stock part, create a job or purchase suggestion for the demand.
•If this is a stock part, calculate the amount of supply available on a specific day and then create the job or purchase suggestion.
•If this is a stock part, is the On-Hand Quantity under the Minimum On-Hand Quantity? If so, create a suggestion for the demand.
•If the Re-Stock to Max check box is selected, the job or purchase suggestion will use the quantity defined within the Part-Plant detail’s Maximum On-Hand Quantity.
•If this is a stock part, is the On-Hand Quantity under the Safety Stock Quantity? If so, create a suggestion for the demand.
•If the Re-Stock to Max check box is selected, this job or purchase suggestion will use the quantity defined within the Part-Plant detail’s Maximum On-Hand Quantity.
By default, the MRP engine will create an unfirm job if it can find a valid method of manufacturing linked to the part. However, if the MRP engine cannot locate a valid part method, it instead generates a job suggestion. You can convert the job suggestions to firm jobs within the Job Manager program.
•Even though you can convert an unfirm job or job suggestion into a firm job, these jobs will continue to be modified each time the MRP engine is run. This is also true for open purchase orders that were originally generated by MRP. The MRP engine will generate suggested changes to open jobs and purchase orders, which you can choose to act on.
•Note that the MRP engine will use the Unfirm Job Prefix value to indicate which jobs were generated by the MRP calculations, and that these job numbers are generated in sequence. You can review the jobs within the Job Entry program. As long as the job has an Unfirm status, it can be deleted by the MRP engine and regenerated as a new unfirm job.
If the MRP engine is run against a firm job, you can limit the suggestions placed against it. You can freeze a firm job’s Due Date or Quantity by selecting the appropriate Lock check box. The MRP engine cannot make suggestions against locked values. Locked values, however, are still evaluated as part of the MRP calculations in order to determine the total supply available against the current demand requirements.
Similar logic is used for purchase orders. After a PO is created from a purchase suggestion, its status is set to Open and suggestions can be placed against it each time the MRP engine is run. You can pull these suggestions into the PO record, updating its releases with the new results. To prevent a release from being changed, however, you can freeze each release’s Due Date and Quantity by selecting the appropriate Lock check box. After you lock the PO, the MRP engine will no longer create suggestions for it. However, the engine will still consider this purchase order during its calculations.
After you close a PO, the MRP engine no longer counts this purchase order during its calculations.
回复

使用道具 举报

 楼主| 发表于 2010/6/22 19:46:05 | 显示全部楼层
ERP知识,会的兄弟就留个见解

回复

使用道具 举报

发表于 2010/6/30 13:40:21 | 显示全部楼层
Pricing and Discounting
The software utilizes a pricing system that gives the user great flexibility for determining prices.
It is designed to work with a variety of business practices. By using all or part of this feature set, the user can define a regular procedure for creating and maintaining prices for their products.
There are two kinds of discounting processes available - quantity-based discounts and value-based discounts. The user can employ a quantity-based discount system, value-based discount system, or both. If both systems are used, the system first calculates the quantity-based discounts. After this discount is applied, the application next compares this new amount with the value breaks.
The user can also define minimum and maximum discount limits on the customer or ship-to location record. These fields are located in the Customer Billing Detail sheet in the Customer maintenance program. If the order exceeds these limits, a different discount percent is applied to the order. The user may also add an additional discount after the quantity- and value-based discounts have been calculated.
There are two types of discounting available in the system:
• Quantity-Based Discounting reviews the quantity on the order line and compares it to the quantity breaks set up on a price list. The system then applies the discount that matches the quantity break.
For quantity-based discounting, the system uses the pricing hierarchy to search for the first available price list. Once it finds a price list for the parts, it uses that unit price for the quote or order detail line.
• Value-Based Discounting takes the total amount on the order and compares it to the value breaks set up within a price group. The system then applies the discount that matches the value break.
Price Groups
The Price Groups program allows the user to combine product groups to do order-based pricing. After the system has assigned a price to the products, the application then checks the discounting options defined for the price group. Once the system has calculated the price against the selected discount option, it displays a final price on the quote or order line.
The Price Groups program provides the ability to establish quantity- or dollar-based discounts based on the product groups identified on each part in the Part master file.
There are three discount options:
• The price group can assign discounts based on the value of the total sale.
• The price group can also be based on the total quantity of the sales.
• The price group can assign discounts based on both the value and the quantity of the total sales.
When both options are used, the system will first use the quantity breaks to apply discounts;
after this, the system will apply the value breaks for additional discounting. When a quantity break is met and the discount is applied, the unit price is discounted appropriately. If a value break is also met, then its discount will be applied and appear as a percentage in the Discount Percent field on the [Line] Detail sheet in sales Order Entry.
A product group can only belong to one price group. A price group, however, can contain multiple product groups.
The Price Group program contains two check boxes on the Detail sheet; Order Based Quantity Discount and Order Based Value Discount. Establish the order value discounts on the Value Breaks sheet of the Price Group program. If the user is also using the quantity discounts, select the check box in the Price Group program, and use the Price List program to assign the quantity breaks.
回复

使用道具 举报

发表于 2013/2/5 19:56:38 | 显示全部楼层
多谢楼主分享资料,手里除了安装包,还真没有别的资料了,谢谢!
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|手机版|壹佰网 ERP100 ( 京ICP备19053597号-2 )

Copyright © 2005-2012 北京海之大网络技术有限责任公司 服务器托管由互联互通
手机:13911575376
网站技术点击发送消息给对方83569622   广告&合作 点击发送消息给对方27675401   点击发送消息给对方634043306   咨询及人才点击发送消息给对方138011526

GMT+8, 2025/11/30 02:37 , Processed in 0.018879 second(s), 13 queries , File On.

Powered by Discuz! X3.4

Copyright © 2001-2020, Tencent Cloud.

快速回复 返回顶部 返回列表